Xerox C75 Press solves the problem that the backpack server is always not ready when installed in the field.

Visitor 272 0
Subject: Backpack server is always not ready when installed
Introduction
Solve the problem that the backpack server is always not ready when installing on-site

Cause of the problem
Failure to install the machine according to the normal operation guidelines, directly assigning IP addresses to IOT and backpack servers or connecting them to the customer network.

Solution
1) Disconnect the network cable connected to the server LAN port and only keep the connection between the IOT Scan port Cross network cable and the server
2) Enter the diagnosis, and set the IP address acquisition method of "Network Settings-> Communication Protocol Settings->IPv4 Mode" to "Obtain from DHCP/Auto IP" in the IOT UI (Figure 1 and Figure 2)
3) set the address acquisition method of "network controller setting-> network setting->TCP/IP" to "manual setting" in IOT UI, and the corresponding IP address, subnet mask and gateway are set as follows: (fig. 3 and fig. 4)
IP address: 100.100.100.102
Subnet mask: 255.255.255.0
Gateway address: 100.100.100.1
Link: https://pan.baidu.com/s/1APQSoiAe-JSbdllw3P9low
Extraction code: 0ogl

Tags: #C75 #J75 #Server #LAN port #IOT

Leave a comment